Line 35: | Line 35: | ||
{{ :mbse:modeling_internal_rate_of_return.png | Internal Rate of Return}} | {{ :mbse:modeling_internal_rate_of_return.png | Internal Rate of Return}} | ||
- | During the creation of a model, a certain amount of time is spent with overhead items like check-in, check-out, copying files, and deciphering complexity and relevance. The more time spent with these actions compared to the overall saved time, the less time is spent actually using a model and -- most importantly -- the less time spent actually achieving business goals and contributing to the business value. | + | During the creation of a model, a certain amount of time is spent with overhead items like check-in, check-out, copying files, and deciphering complexity and relevance. The more time spent with these actions compared to the overall saved time, the less time is spent actually using a model and -- most importantly -- the less time spent actually achieving business goals and contributing to the business value. |
+ | |||
+ | Generally, when the IRR for a tactic is lower than the forecast price of money over the durations of consideration, then an enterprise may be better of not using the tactic because they'd earn a better return simply by banking the costs of development. | ||
===== Upcoming events ===== | ===== Upcoming events ===== | ||
Line 41: | Line 43: | ||
{{ :mbse:vision_slide_for_iw2016.png?480|The MLM AT Vision as of 2016 }} | {{ :mbse:vision_slide_for_iw2016.png?480|The MLM AT Vision as of 2016 }} | ||
- | * INCOSE IW2016, 30 January 2016, Agenda {{:mbse:incose_mlm_meeting_agenda_30_january_2016.xlsx||here}} | + | * INCOSE IW2017, 28 January 2017, Torrance, CA |
- | * Team Call, 04 December 2015, Agenda {{:mbse:incose_mlm_meeting_agenda_04_december_2015.xlsx||here}} | + | |
Line 61: | Line 63: | ||
* [2003] Tools Interoperability ConOps {{https://connect.incose.org/WorkingGroups/TII/SAWG%20Shared%20Documents/TIIWG%20Work%20Products/ISEE%20SRD%20and%20CONOPS/ISEE_Conops%20022003.DOC|here}} | * [2003] Tools Interoperability ConOps {{https://connect.incose.org/WorkingGroups/TII/SAWG%20Shared%20Documents/TIIWG%20Work%20Products/ISEE%20SRD%20and%20CONOPS/ISEE_Conops%20022003.DOC|here}} | ||
+ | |||
+ | ==== PLM4MBSE Working Group ==== | ||
+ | |||
+ | * {{:mbse:plm4mbse_position_paper_v1_0_july_2015.pdf|"10 theses about MBSE and PLM", July 2015 V1.0 Version}} | ||
+ | |||
+ | ==== OMG SE DSIG Papers ==== | ||
+ | |||
+ | * {{:mbse:modelmgt:mwg_plm_se_paper.pdf|"Virtually Indistinguishable Systems Engineering and PLM", IFIP International Federation for Information Processing 2012 Version}} | ||
===== White Papers ===== | ===== White Papers ===== | ||
Line 71: | Line 81: | ||
* {{:mbse:incose_is_2014_mm_paper_review_.pdf|"Model Lifecycle Management for MBSE", Reviewers summary}} | * {{:mbse:incose_is_2014_mm_paper_review_.pdf|"Model Lifecycle Management for MBSE", Reviewers summary}} | ||
- | ==== PLM4MBSE Working Group ==== | ||
- | * {{:mbse:plm4mbse_position_paper_v1_0_july_2015.pdf|"10 theses about MBSE and PLM", July 2015 V1.0 Version}} | ||
===== Pre-2014 Collaboration Site ===== | ===== Pre-2014 Collaboration Site ===== | ||
Line 84: | Line 92: | ||
===== Activity Pages ===== | ===== Activity Pages ===== | ||
+ | * Topical Guide to the IW2017 events of the TIMLM Working Group [[mbse:modelmgt:topics_iw2017|Here]] | ||
+ | * Event Report for IS 2016 [[mbse:modelmgt:report_is2016|Here]] | ||
* Panel Preparation for IS 2016 [[mbse:modelmgt:panel_is2016|Here]] | * Panel Preparation for IS 2016 [[mbse:modelmgt:panel_is2016|Here]] | ||
* MLM-S Stakeholders Analysis [[mbse:modelmgt:stakeholders|Here]] | * MLM-S Stakeholders Analysis [[mbse:modelmgt:stakeholders|Here]] | ||
Line 96: | Line 106: | ||
===== History ===== | ===== History ===== | ||
+ | |||
+ | |||
==== 30 January 2016 INCOSE IW (Day 1) ==== | ==== 30 January 2016 INCOSE IW (Day 1) ==== | ||
Line 153: | Line 165: | ||
==== 02 February 2016 INCOSE IW (Day 4) ==== | ==== 02 February 2016 INCOSE IW (Day 4) ==== | ||
+ | |||
+ | ==== 04 December 2015, Team Call ==== | ||
+ | |||
+ | * Agenda {{:mbse:incose_mlm_meeting_agenda_04_december_2015.xlsx||here}} | ||
==== Model Management Telecon - 2015 September 04 ==== | ==== Model Management Telecon - 2015 September 04 ==== |