User Tools

Site Tools


mbse:modelmgt

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
mbse:modelmgt [2016/02/01 23:07]
lvanzandt
mbse:modelmgt [2016/12/28 08:31] (current)
lvanzandt [Activity Pages]
Line 35: Line 35:
 {{ :​mbse:​modeling_internal_rate_of_return.png | Internal Rate of Return}} {{ :​mbse:​modeling_internal_rate_of_return.png | Internal Rate of Return}}
  
-During the creation of a model, a certain amount of time is spent with overhead items like check-in, check-out, copying files, and deciphering complexity and relevance. ​ The more time spent with these actions compared to the overall saved time, the less time is spent actually using a model and -- most importantly -- the less time spent actually achieving business goals and contributing to the business value. ​+During the creation of a model, a certain amount of time is spent with overhead items like check-in, check-out, copying files, and deciphering complexity and relevance. ​ The more time spent with these actions compared to the overall saved time, the less time is spent actually using a model and -- most importantly -- the less time spent actually achieving business goals and contributing to the business value
 + 
 +Generally, when the IRR for a tactic is lower than the forecast price of money over the durations of consideration,​ then an enterprise may be better of not using the tactic because they'd earn a better return simply by banking the costs of development.
  
 ===== Upcoming events =====  ===== Upcoming events ===== 
Line 41: Line 43:
 {{ :​mbse:​vision_slide_for_iw2016.png?​480|The MLM AT Vision as of 2016 }} {{ :​mbse:​vision_slide_for_iw2016.png?​480|The MLM AT Vision as of 2016 }}
  
-  * INCOSE ​IW201630 January ​2016Agenda {{:​mbse:​incose_mlm_meeting_agenda_30_january_2016.xlsx||here}} +  * INCOSE ​IW201728 January ​2017Torrance, CA 
-  * Team Call, 04 December 2015, Agenda {{:​mbse:​incose_mlm_meeting_agenda_04_december_2015.xlsx||here}}+
  
  
Line 61: Line 63:
  
   * [2003] Tools Interoperability ConOps {{https://​connect.incose.org/​WorkingGroups/​TII/​SAWG%20Shared%20Documents/​TIIWG%20Work%20Products/​ISEE%20SRD%20and%20CONOPS/​ISEE_Conops%20022003.DOC|here}}   * [2003] Tools Interoperability ConOps {{https://​connect.incose.org/​WorkingGroups/​TII/​SAWG%20Shared%20Documents/​TIIWG%20Work%20Products/​ISEE%20SRD%20and%20CONOPS/​ISEE_Conops%20022003.DOC|here}}
 +
 +==== PLM4MBSE Working Group ====
 +
 +  * {{:​mbse:​plm4mbse_position_paper_v1_0_july_2015.pdf|"​10 theses about MBSE and PLM", July 2015 V1.0 Version}}
 +
 +==== OMG SE DSIG Papers ====
 +
 +  * {{:​mbse:​modelmgt:​mwg_plm_se_paper.pdf|"​Virtually Indistinguishable Systems Engineering and PLM", IFIP International Federation for Information Processing 2012 Version}}
  
 ===== White Papers ===== ===== White Papers =====
Line 71: Line 81:
   * {{:​mbse:​incose_is_2014_mm_paper_review_.pdf|"​Model Lifecycle Management for MBSE", Reviewers summary}}   * {{:​mbse:​incose_is_2014_mm_paper_review_.pdf|"​Model Lifecycle Management for MBSE", Reviewers summary}}
  
-==== PLM4MBSE Working Group ==== 
  
-  * {{:​mbse:​plm4mbse_position_paper_v1_0_july_2015.pdf|"​10 theses about MBSE and PLM", July 2015 V1.0 Version}} 
  
 ===== Pre-2014 Collaboration Site ===== ===== Pre-2014 Collaboration Site =====
Line 84: Line 92:
  
 ===== Activity Pages ===== ===== Activity Pages =====
 +  * Topical Guide to the IW2017 events of the TIMLM Working Group [[mbse:​modelmgt:​topics_iw2017|Here]]
 +  * Event Report for IS 2016 [[mbse:​modelmgt:​report_is2016|Here]]
   * Panel Preparation for IS 2016 [[mbse:​modelmgt:​panel_is2016|Here]]   * Panel Preparation for IS 2016 [[mbse:​modelmgt:​panel_is2016|Here]]
   * MLM-S Stakeholders Analysis [[mbse:​modelmgt:​stakeholders|Here]]   * MLM-S Stakeholders Analysis [[mbse:​modelmgt:​stakeholders|Here]]
Line 96: Line 106:
  
 ===== History ===== ===== History =====
 +
 +
 ==== 30 January 2016 INCOSE IW (Day 1) ==== ==== 30 January 2016 INCOSE IW (Day 1) ====
  
Line 153: Line 165:
  
 ==== 02 February 2016 INCOSE IW (Day 4) ==== ==== 02 February 2016 INCOSE IW (Day 4) ====
 +
 +==== 04 December 2015, Team Call ====
 +
 +  * Agenda {{:​mbse:​incose_mlm_meeting_agenda_04_december_2015.xlsx||here}}
  
 ==== Model Management Telecon - 2015 September 04 ==== ==== Model Management Telecon - 2015 September 04 ====
mbse/modelmgt.1454386061.txt.gz · Last modified: 2016/02/01 23:07 by lvanzandt