User Tools

Site Tools


mbse:modelmgt

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
mbse:modelmgt [2016/02/01 23:06]
lvanzandt
mbse:modelmgt [2016/12/28 08:31] (current)
lvanzandt [Activity Pages]
Line 29: Line 29:
   * The industry no longer suffers from the lack of adequate collaborative modeling and decision-making systems   * The industry no longer suffers from the lack of adequate collaborative modeling and decision-making systems
  
-==== Where'​s ​The IRR? ====+==== What'​s ​the IRR? ====
  
 The measure of success perhaps of most interest to managers and modelers alike is: the implied internal rate of return, the rate at which the economic gains from the use of the model begins to exceed the economic costs of the development and maintenance of that model: The measure of success perhaps of most interest to managers and modelers alike is: the implied internal rate of return, the rate at which the economic gains from the use of the model begins to exceed the economic costs of the development and maintenance of that model:
Line 35: Line 35:
 {{ :​mbse:​modeling_internal_rate_of_return.png | Internal Rate of Return}} {{ :​mbse:​modeling_internal_rate_of_return.png | Internal Rate of Return}}
  
-During the creation of a model, a certain amount of time is spent with overhead items like check-in, check-out, copying files, and deciphering complexity and relevance. ​ The more time spent with these actions compared to the overall saved time, the less time is spent actually using a model and -- most importantly -- the less time spent actually achieving business goals and contributing to the business value. ​+During the creation of a model, a certain amount of time is spent with overhead items like check-in, check-out, copying files, and deciphering complexity and relevance. ​ The more time spent with these actions compared to the overall saved time, the less time is spent actually using a model and -- most importantly -- the less time spent actually achieving business goals and contributing to the business value
 + 
 +Generally, when the IRR for a tactic is lower than the forecast price of money over the durations of consideration,​ then an enterprise may be better of not using the tactic because they'd earn a better return simply by banking the costs of development.
  
 ===== Upcoming events =====  ===== Upcoming events ===== 
Line 41: Line 43:
 {{ :​mbse:​vision_slide_for_iw2016.png?​480|The MLM AT Vision as of 2016 }} {{ :​mbse:​vision_slide_for_iw2016.png?​480|The MLM AT Vision as of 2016 }}
  
-  * INCOSE ​IW201630 January ​2016Agenda {{:​mbse:​incose_mlm_meeting_agenda_30_january_2016.xlsx||here}} +  * INCOSE ​IW201728 January ​2017Torrance, CA 
-  * Team Call, 04 December 2015, Agenda {{:​mbse:​incose_mlm_meeting_agenda_04_december_2015.xlsx||here}}+
  
  
Line 61: Line 63:
  
   * [2003] Tools Interoperability ConOps {{https://​connect.incose.org/​WorkingGroups/​TII/​SAWG%20Shared%20Documents/​TIIWG%20Work%20Products/​ISEE%20SRD%20and%20CONOPS/​ISEE_Conops%20022003.DOC|here}}   * [2003] Tools Interoperability ConOps {{https://​connect.incose.org/​WorkingGroups/​TII/​SAWG%20Shared%20Documents/​TIIWG%20Work%20Products/​ISEE%20SRD%20and%20CONOPS/​ISEE_Conops%20022003.DOC|here}}
 +
 +==== PLM4MBSE Working Group ====
 +
 +  * {{:​mbse:​plm4mbse_position_paper_v1_0_july_2015.pdf|"​10 theses about MBSE and PLM", July 2015 V1.0 Version}}
 +
 +==== OMG SE DSIG Papers ====
 +
 +  * {{:​mbse:​modelmgt:​mwg_plm_se_paper.pdf|"​Virtually Indistinguishable Systems Engineering and PLM", IFIP International Federation for Information Processing 2012 Version}}
  
 ===== White Papers ===== ===== White Papers =====
Line 71: Line 81:
   * {{:​mbse:​incose_is_2014_mm_paper_review_.pdf|"​Model Lifecycle Management for MBSE", Reviewers summary}}   * {{:​mbse:​incose_is_2014_mm_paper_review_.pdf|"​Model Lifecycle Management for MBSE", Reviewers summary}}
  
-==== PLM4MBSE Working Group ==== 
  
-  * {{:​mbse:​plm4mbse_position_paper_v1_0_july_2015.pdf|"​10 theses about MBSE and PLM", July 2015 V1.0 Version}} 
  
 ===== Pre-2014 Collaboration Site ===== ===== Pre-2014 Collaboration Site =====
Line 84: Line 92:
  
 ===== Activity Pages ===== ===== Activity Pages =====
 +  * Topical Guide to the IW2017 events of the TIMLM Working Group [[mbse:​modelmgt:​topics_iw2017|Here]]
 +  * Event Report for IS 2016 [[mbse:​modelmgt:​report_is2016|Here]]
   * Panel Preparation for IS 2016 [[mbse:​modelmgt:​panel_is2016|Here]]   * Panel Preparation for IS 2016 [[mbse:​modelmgt:​panel_is2016|Here]]
   * MLM-S Stakeholders Analysis [[mbse:​modelmgt:​stakeholders|Here]]   * MLM-S Stakeholders Analysis [[mbse:​modelmgt:​stakeholders|Here]]
Line 96: Line 106:
  
 ===== History ===== ===== History =====
 +
 +
 ==== 30 January 2016 INCOSE IW (Day 1) ==== ==== 30 January 2016 INCOSE IW (Day 1) ====
  
Line 153: Line 165:
  
 ==== 02 February 2016 INCOSE IW (Day 4) ==== ==== 02 February 2016 INCOSE IW (Day 4) ====
 +
 +==== 04 December 2015, Team Call ====
 +
 +  * Agenda {{:​mbse:​incose_mlm_meeting_agenda_04_december_2015.xlsx||here}}
  
 ==== Model Management Telecon - 2015 September 04 ==== ==== Model Management Telecon - 2015 September 04 ====
mbse/modelmgt.1454386019.txt.gz · Last modified: 2016/02/01 23:06 by lvanzandt