User Tools

Site Tools


mbse:modelmgt

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
mbse:modelmgt [2016/02/01 22:48]
lvanzandt
mbse:modelmgt [2016/12/28 08:31] (current)
lvanzandt [Activity Pages]
Line 29: Line 29:
   * The industry no longer suffers from the lack of adequate collaborative modeling and decision-making systems   * The industry no longer suffers from the lack of adequate collaborative modeling and decision-making systems
  
-==== Where'​s ​The IRR? ====+==== What'​s ​the IRR? ====
  
-The measure of success perhaps of most interest to managers and modelers alike is: internal rate of return, the implied ​rate where the cost of the  total time that model eliminates from the acquisition ​and maintenance of a system exceeds the cost of the time spent actually creating a model:+The measure of success perhaps of most interest to managers and modelers alike is: the implied ​internal rate of return, the rate at which the economic gains from the use of the model begins to exceed ​the economic costs of the development ​and maintenance of that model:
  
-  IRR = m1, m2, and 0 == NPV( savings in labor and schedule of system due to existence ​of model, m1 ) - NPV( cost in labor and schedule to create and maintain model, m2 ) }+{{ :​mbse:​modeling_internal_rate_of_return.png ​Internal Rate of Return}}
  
-Note that the prices ​of money m1 and m2 may differ over the different intervals during which the model is developed ​and maintained ​and during which any labor and maintenance costs of the system are accrued.+During ​the creation ​of a model, a certain amount of time is spent with overhead items like check-in, check-out, copying files, and deciphering complexity ​and relevance. ​ The more time spent with these actions compared to the overall saved time, the less time is spent actually using a model and -- most importantly -- the less time spent actually achieving business goals and contributing to the business value.
  
- +Generally, when the IRR for tactic ​is lower than the forecast price of money over the durations of considerationthen an enterprise may be better of not using the tactic because they'd earn better return simply by banking ​the costs of development.
-During ​the creation of model, a certain amount of time is spent with overhead items like check-in, check-out, copying files, and deciphering complexity and relevance. ​ The more time spent with these actions compared to the overall saved time, the less time is spent actually using model and -- most importantly -- the less time spent actually achieving business goals and contributing to the business value+
  
 ===== Upcoming events =====  ===== Upcoming events ===== 
Line 44: Line 43:
 {{ :​mbse:​vision_slide_for_iw2016.png?​480|The MLM AT Vision as of 2016 }} {{ :​mbse:​vision_slide_for_iw2016.png?​480|The MLM AT Vision as of 2016 }}
  
-  * INCOSE ​IW201630 January ​2016Agenda {{:​mbse:​incose_mlm_meeting_agenda_30_january_2016.xlsx||here}} +  * INCOSE ​IW201728 January ​2017Torrance, CA 
-  * Team Call, 04 December 2015, Agenda {{:​mbse:​incose_mlm_meeting_agenda_04_december_2015.xlsx||here}}+
  
  
Line 64: Line 63:
  
   * [2003] Tools Interoperability ConOps {{https://​connect.incose.org/​WorkingGroups/​TII/​SAWG%20Shared%20Documents/​TIIWG%20Work%20Products/​ISEE%20SRD%20and%20CONOPS/​ISEE_Conops%20022003.DOC|here}}   * [2003] Tools Interoperability ConOps {{https://​connect.incose.org/​WorkingGroups/​TII/​SAWG%20Shared%20Documents/​TIIWG%20Work%20Products/​ISEE%20SRD%20and%20CONOPS/​ISEE_Conops%20022003.DOC|here}}
 +
 +==== PLM4MBSE Working Group ====
 +
 +  * {{:​mbse:​plm4mbse_position_paper_v1_0_july_2015.pdf|"​10 theses about MBSE and PLM", July 2015 V1.0 Version}}
 +
 +==== OMG SE DSIG Papers ====
 +
 +  * {{:​mbse:​modelmgt:​mwg_plm_se_paper.pdf|"​Virtually Indistinguishable Systems Engineering and PLM", IFIP International Federation for Information Processing 2012 Version}}
  
 ===== White Papers ===== ===== White Papers =====
Line 74: Line 81:
   * {{:​mbse:​incose_is_2014_mm_paper_review_.pdf|"​Model Lifecycle Management for MBSE", Reviewers summary}}   * {{:​mbse:​incose_is_2014_mm_paper_review_.pdf|"​Model Lifecycle Management for MBSE", Reviewers summary}}
  
-==== PLM4MBSE Working Group ==== 
  
-  * {{:​mbse:​plm4mbse_position_paper_v1_0_july_2015.pdf|"​10 theses about MBSE and PLM", July 2015 V1.0 Version}} 
  
 ===== Pre-2014 Collaboration Site ===== ===== Pre-2014 Collaboration Site =====
Line 87: Line 92:
  
 ===== Activity Pages ===== ===== Activity Pages =====
 +  * Topical Guide to the IW2017 events of the TIMLM Working Group [[mbse:​modelmgt:​topics_iw2017|Here]]
 +  * Event Report for IS 2016 [[mbse:​modelmgt:​report_is2016|Here]]
   * Panel Preparation for IS 2016 [[mbse:​modelmgt:​panel_is2016|Here]]   * Panel Preparation for IS 2016 [[mbse:​modelmgt:​panel_is2016|Here]]
   * MLM-S Stakeholders Analysis [[mbse:​modelmgt:​stakeholders|Here]]   * MLM-S Stakeholders Analysis [[mbse:​modelmgt:​stakeholders|Here]]
Line 99: Line 106:
  
 ===== History ===== ===== History =====
 +
 +
 ==== 30 January 2016 INCOSE IW (Day 1) ==== ==== 30 January 2016 INCOSE IW (Day 1) ====
  
Line 156: Line 165:
  
 ==== 02 February 2016 INCOSE IW (Day 4) ==== ==== 02 February 2016 INCOSE IW (Day 4) ====
 +
 +==== 04 December 2015, Team Call ====
 +
 +  * Agenda {{:​mbse:​incose_mlm_meeting_agenda_04_december_2015.xlsx||here}}
  
 ==== Model Management Telecon - 2015 September 04 ==== ==== Model Management Telecon - 2015 September 04 ====
mbse/modelmgt.1454384892.txt.gz · Last modified: 2016/02/01 22:48 by lvanzandt