User Tools

Site Tools


mbse:modelmgt

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
mbse:modelmgt [2016/02/01 22:48]
lvanzandt
mbse:modelmgt [2016/12/28 08:28]
lvanzandt [30 January 2016, INCOSE IW2016]
Line 29: Line 29:
   * The industry no longer suffers from the lack of adequate collaborative modeling and decision-making systems   * The industry no longer suffers from the lack of adequate collaborative modeling and decision-making systems
  
-==== Where'​s ​The IRR? ====+==== What'​s ​the IRR? ====
  
-The measure of success perhaps of most interest to managers and modelers alike is: internal rate of return, the implied ​rate where the cost of the  total time that model eliminates from the acquisition ​and maintenance of a system exceeds the cost of the time spent actually creating a model:+The measure of success perhaps of most interest to managers and modelers alike is: the implied ​internal rate of return, the rate at which the economic gains from the use of the model begins to exceed ​the economic costs of the development ​and maintenance of that model:
  
-  IRR = m1, m2, and 0 == NPV( savings in labor and schedule of system due to existence ​of model, m1 ) - NPV( cost in labor and schedule to create and maintain model, m2 ) }+{{ :​mbse:​modeling_internal_rate_of_return.png ​Internal Rate of Return}}
  
-Note that the prices ​of money m1 and m2 may differ over the different intervals during which the model is developed ​and maintained ​and during which any labor and maintenance costs of the system are accrued.+During ​the creation ​of a model, a certain amount of time is spent with overhead items like check-in, check-out, copying files, and deciphering complexity ​and relevance. ​ The more time spent with these actions compared to the overall saved time, the less time is spent actually using a model and -- most importantly -- the less time spent actually achieving business goals and contributing to the business value.
  
- +Generally, when the IRR for tactic ​is lower than the forecast price of money over the durations of considerationthen an enterprise may be better of not using the tactic because they'd earn better return simply by banking ​the costs of development.
-During ​the creation of model, a certain amount of time is spent with overhead items like check-in, check-out, copying files, and deciphering complexity and relevance. ​ The more time spent with these actions compared to the overall saved time, the less time is spent actually using model and -- most importantly -- the less time spent actually achieving business goals and contributing to the business value+
  
 ===== Upcoming events =====  ===== Upcoming events ===== 
Line 44: Line 43:
 {{ :​mbse:​vision_slide_for_iw2016.png?​480|The MLM AT Vision as of 2016 }} {{ :​mbse:​vision_slide_for_iw2016.png?​480|The MLM AT Vision as of 2016 }}
  
-  * INCOSE ​IW201630 January ​2016Agenda {{:​mbse:​incose_mlm_meeting_agenda_30_january_2016.xlsx||here}} +  * INCOSE ​IW201728 January ​2017Torrance, CA 
-  * Team Call, 04 December 2015, Agenda {{:​mbse:​incose_mlm_meeting_agenda_04_december_2015.xlsx||here}}+
  
  
Line 64: Line 63:
  
   * [2003] Tools Interoperability ConOps {{https://​connect.incose.org/​WorkingGroups/​TII/​SAWG%20Shared%20Documents/​TIIWG%20Work%20Products/​ISEE%20SRD%20and%20CONOPS/​ISEE_Conops%20022003.DOC|here}}   * [2003] Tools Interoperability ConOps {{https://​connect.incose.org/​WorkingGroups/​TII/​SAWG%20Shared%20Documents/​TIIWG%20Work%20Products/​ISEE%20SRD%20and%20CONOPS/​ISEE_Conops%20022003.DOC|here}}
 +
 +==== PLM4MBSE Working Group ====
 +
 +  * {{:​mbse:​plm4mbse_position_paper_v1_0_july_2015.pdf|"​10 theses about MBSE and PLM", July 2015 V1.0 Version}}
 +
 +==== OMG SE DSIG Papers ====
 +
 +  * {{:​mbse:​modelmgt:​mwg_plm_se_paper.pdf|"​Virtually Indistinguishable Systems Engineering and PLM", IFIP International Federation for Information Processing 2012 Version}}
  
 ===== White Papers ===== ===== White Papers =====
Line 74: Line 81:
   * {{:​mbse:​incose_is_2014_mm_paper_review_.pdf|"​Model Lifecycle Management for MBSE", Reviewers summary}}   * {{:​mbse:​incose_is_2014_mm_paper_review_.pdf|"​Model Lifecycle Management for MBSE", Reviewers summary}}
  
-==== PLM4MBSE Working Group ==== 
  
-  * {{:​mbse:​plm4mbse_position_paper_v1_0_july_2015.pdf|"​10 theses about MBSE and PLM", July 2015 V1.0 Version}} 
  
 ===== Pre-2014 Collaboration Site ===== ===== Pre-2014 Collaboration Site =====
Line 87: Line 92:
  
 ===== Activity Pages ===== ===== Activity Pages =====
 +  * Event Report for IS 2016 [[mbse:​modelmgt:​report_is2016|Here]]
   * Panel Preparation for IS 2016 [[mbse:​modelmgt:​panel_is2016|Here]]   * Panel Preparation for IS 2016 [[mbse:​modelmgt:​panel_is2016|Here]]
   * MLM-S Stakeholders Analysis [[mbse:​modelmgt:​stakeholders|Here]]   * MLM-S Stakeholders Analysis [[mbse:​modelmgt:​stakeholders|Here]]
Line 99: Line 105:
  
 ===== History ===== ===== History =====
 +
 +
 ==== 30 January 2016 INCOSE IW (Day 1) ==== ==== 30 January 2016 INCOSE IW (Day 1) ====
  
Line 156: Line 164:
  
 ==== 02 February 2016 INCOSE IW (Day 4) ==== ==== 02 February 2016 INCOSE IW (Day 4) ====
 +
 +==== 04 December 2015, Team Call ====
 +
 +  * Agenda {{:​mbse:​incose_mlm_meeting_agenda_04_december_2015.xlsx||here}}
  
 ==== Model Management Telecon - 2015 September 04 ==== ==== Model Management Telecon - 2015 September 04 ====
mbse/modelmgt.txt · Last modified: 2016/12/28 08:31 by lvanzandt